EHS Emergency Response Exercise
Current location: Home > EHS Emergency Response Exercise
Long-term education and training system:
EHS Emergency Plan and Response:
1. Establish emergency plan in advance
2. Training employee for emergency plan
3. Drilling for emergency plan
4. Summarizing the emergency plan drilling
◇ EHS Control:
A. Equipment Safety Control:
Equipment is classified into 3 types: Production equipment, Special equipment, environmental protection/safety equipment
Before purchasing special equipment or environmental protection equipment, production license/quality certificates/other valid certificates (applicable) must be available from manufacturers
Operators for special equipment must go through safety/technical training, exams, acquire qualification and operation certificates, before operate independently; Operation of special equipment is prohibited if without the certificates.
B. Accident Control:
Prevent accident
Analyse accident causes
Take correction measures against accident causes
Train the relevant employee
Give the responsible employee due treatment
C. Emergency Plan and Response:
1.Establish emergency plan in advance
2.Training employee for emergency plan
3.Drilling for emergency plan
4.Summarizing the emergency plan drilling
D. Safety Inspection:
Establish and implement Inspection System
Make correction plans for problems found through inspection, assign responsibility to personnel and decide deadline for completion of corrections
◇ Environment Protection
We consider the protection of the environment as our direct responsibility and all our processes and technologies incorporate this feature.
2002 (March ) ISO14001
2006 (August) ISO 14001:2004
Waste water capacity& Investment:
Plant No.1 (Waisha) | 1800T/DAY | RMG 20million |
Plant No.1 Chuannan | 1500T/DAY | RMG 30million |
Plant No.1 Yizhou | 700T/DAY | RMG 5.2million |
Plant No.1 zongbei | 200T/DAY | RMG 2.6million |